UK Point Of Sale 2014

Bredbury, Stockport

UKPOS moved to larger premises in Stockport.  The existing office space within a larger warehouse space was completely refurbished and an additional floor added (to be fitted out at a later date).  New toilets, changing rooms, office space, mess area and showroom were included in the build.  

We introduced the ECA scheme to the client to allow full capital tax relief on the lighting throughout the refurbished area.

Key Facts

  • £40, 000 +
  • 8 week
  • Design & Build
  • CDM Site

Project Outline

Skill 1: Design & build small power, lighting, fire alarm, data

Skill 2: Design lighting and controls to meet ECA guidelines to allow 100% tax relief year one

Skill 3: Completion of Health & Safety file

Skill 4: Design showroom lighting