Sheffield Hallam University, Arundal House 2014-15

Sheffield Centre

Part of a multi-million pound project relocating Sheffield Hallam University office staff from their older rented property to their new office only several hundred meters further up the road. The six floor refurbishment included a design and build Dali dimmable lighting system developed between Phaseline, Entech Controls and Selux Lighting to meet the design specification.  Further to that was the complete design and build of the power and data systems.

 

Key Facts

  • £250k project value excluding lights and controls
  • 16 week duration
  • Full design and build
  • SKA Gold standard required

Project Outline

Skill 1:  Project duration reduced

Skill 2:  Containment problems solved due to lack of ceiling height

Skill 3:  Keep up with design requirement changes throughout the project.